Infrastructure
Brief Introduction For the Project of Binzhou Port
I. Brief Survey
Binzhou Port, acting as a northern gate of Shandong, is located on the southwestern coast of the Bohai Sea. It represents the intersection of the two developed areas:Beijing-Tianjin-hebei and the Shandong Peninsular. Located on the central area of the Yellow River Delta, it also acts as the only import and export cargo port in northwestern Shandong. The hinterland of the port runs across three provinces and eight cities. With a total area of 100 thousand square kilometers, the hinterland provides home to 60 million people. Ten 500-3000 tonnage berthes and 11 kilometers of diversion embankment have been built. The annual handling capacity is expected to be 3 million tons.
Future Plan for Binzhou Port: By the year 2020, Binzhou Port will be built into a key harbour with the handling capacity of 60 to 100 million tonnage in the coastal areas of Shandong, fitted with modern loading and unloading facilities, management and storage equipments, export processing zone, together with 53 30-50 thousand tonnage open berthes which can do tranfer or through service.
II. Brief Survey of The Company
Binzhou Port Administration Co.,Ltd. is a large state-owned enterprise which is in charge of port construction as well as matters involving foreign joint venture and cooperation on behalf of Binzhou city government. With registered capital of 251.8 million yuan RMB, the company owns four subcompanys: East Port Company, West Port Company, Channel Company and Hangsheng Concrete Engineering Company. The company has 236 staff members, among which managerial staff 22 and professional staff 57. The company mainly involves in port construction, ship manufacture, dock loading and unloading, storage, logistics, commodity package, channel dredge as well as leasing trade in port, storerooms, houses and machinery equipments. The annual output reachs to 1.06 billion yuan RMB whichs achieves profit and tax 150 million yuan RMB.
III. Comparative Advantage
i) Particularly Favarable Geographical Location
Located at Yellow River Delta and the juncture of the economic areas around the Bohai Sea and the Jiaodong Pennisular, Binzhou Port, adjoining to the economic areas around Beijing and Tianjin, is the nearest port in Shandong that connects the Tianjin Binhai Newly Developed Area. It acts as a bridge that joins the cities in Shandong Pennisular and that in middle and western China. It is the key pivot that connects the economic areas around the Bohai Sea as well as the only import and export cargo port in northwestern Shandong. Binzhou Port is the most convinient and cheapest access to the sea in middle and northwestern Shandong(provincial capital Jinan Metropolitan Area included). It has been listed by Shandong provincial government as an important part of the city cluster in Shandong Pennisular, a key member in the economic areas around the Bohai Sea, a significant “wing” of the city cluster in Shandong Pennisular and the main member of Jinan Metropolitan Area.
ii) Vast economic hinterland which is rich and profound
Straddling across three provinces and eight cities, the hinterland of Binzhou Port, with a total area of 100 thousand square kilometers, provides home to 60 million people. The hinterland includes the cities in Shandong like Binzhou, Dongying, Zibo, Dezhou, Liaocheng, Jinan and Laiwu and the southeastern regions in Hebei. It can promotes the regional economic development in the middle and southwestern part of Shandong, in the middle part of Hebei, as well as in Shanxi and Shaanxi province. After years of development, many dominent industries have taken into shape, such as: oil chemical industry, salt chemical industry, automobile engine and spare parts, textile(including home textile and garments), machinery electronics industry, papermaking industry, deep processing industry for corn, oil, fruits and vegetables, as well as building materials industry. The oil chemical industry enjoys particularly rapid development: In the year 2005, the raw oil processing capacity of the 12 oil refinery mills in Binzhou, Zibo and Dongying reaches 20.65 million tons. And in 2010, the said capacity will surpass 40 million tons. This area enjoys the special favour of nature in the development of oil chemical industry.
iii) Adequate Freight Volume Demand
Binzhou port is vast in hinterland and plentiful in products. The presence of 26 kinds of minerals has been verified. Oil and natural gas reserves are also very rich. Binzhou acts as the key oil recovery area of Shengli Oil Field, the No.2 oil field in China, and an essential production base for raw salt and raw cotton in Shandong. At present, in the territory of Binzhou city only, the material transport volume can reach 60 million tons: raw salt 12 million tons, generating coal 20 million tons, ore and mine engineering materials 6 million tons, Oil in the Bohai Sea 15 million tons, the materials and products of the corn and oil in some big enterprises in Binzhou (Xiwang Sugar Factory, Jinhui Corn, Xiangchi Corn & Oil, etc) 10 million tons. Besides that, ore transport volume in Laiwu and Jinan Steel & Iron Group Corporation is close to 100 million tons which fully meets the requirements of the handling capacity of a 10 thousand tonnage harbour.
iv) Big Low Beaches and Waters
The coastline of Binzhou stretches 240 kilometers. Within the martime space of Binzhou, the intertidal region formed by sedimentary silt covers a vast area, among which 170 thousand hectares remain unexploited, providing rich land resources for the development of Binzhou port and its nearby industries. The usable waters in Binzhou port reachs 243 thousand hectares, which offers a vast area for the development of the port and for the holding ground of the ships.
v) Strong Economic Support
The CPC Binzhou committee and city government fully implement the Scientific Concept of Development and the economy and society achieve sustainable, rapid and sound development which provides strong economic support for the construction and development of Binzhou port. Binzhou’s GDP in 2007 reached 100 billion yuan, an increase of 17% over the previous year. Local government revenue came to 5.9 billion yuan, up 37.7%. New loans of the local financial organizations reached 15 billion yuan. The increasing scope of the main economic targets ranked first three places in Shandong for 5 years in succession. Especially the 10 new industries, like plane, automobile, ship and spareparts manufactureing, are on the upswing. It is estimated that when all the 10 industries have been finished, output value can reach more than 150 billion yuan. All of the above will provide strong hinterland economic support for the construction of the 10 thousand tonnage Binzhou port.
IV. Content of the Project
In accordance with the principle of scientific construction, the first course of the project adopts a plan that combines dredging and renovation. Being surrounded by other buildings on all sides excpet the west side, the harbour includes double embankments, three 50 thousand tonnage raw oil docks and two 30 thousand tonnage bulk cargo docks. The traffic capacity is 20 million tonnage. Total invested amount is estimated to be 3.08 billion yuan. Main content of the project:
i) The Reconstruction Project of Binzhou Port West Guide Embankment
The length and width of the guide dyke are 15.584 kilometers and 50 meters respectively, which meet the fundimental requirements for the two-way four-lane first Grade road, one-way I Class A Grade railroad which regulate the flow of ships and cargos, as well as the oil lines in the port. The project is started in March, 2007 and will complete its main body by the end of December, 2008. The construction period is 2 years.
The project has been put under an authorized plan and attracted investment amount of 520 million yuan. The guide dyke of 11 kilometers has moved forward into the sea. It is planned that the main body will be finished by 2008.
Total invested amount is estimated to be 1.83 billion yuan. Funds raised by the government will be 460 million yuan, among which 106 million has been in place. 240 million yuan will be raised by the company itself. Foreign capital is planned to be 1.13 billion yuan.
Road transportation is the main collecting and dredging transport method in the sea port area of Binzhou. The reconstructed West Guide Embankment is the only channeal between the dock in the sea port area and the land place. It also serves as the stretching part of the first Grade road which regulate the flow of cargos in the port. The road is also listed in the recontructed provincial arterial road grid and will achieve prominent social benefits.
ii) Binzhou Port 2×3 Ten Thousand Tonnage Bulk Cargo Dock Project
With two docks of 3 ten thousand tonnage bulk cargo, the designed navigation capacity is 5 million tonnage. Coordinated facilities such as stacking ground, storehouses, loading and unloading equipments, water and electricity will be constructed simultaneoously.
Environment evaluation and the right to use the sea area have been approved by the provincial authorities. The Project Feasibility Report, which has been studied and approved by the experts from Shandong Communications Department and Shandong Committee of Development and Reform, has been reported to the provincial Committee of Development and Reform and is now waiting for its approval. The project will start in the year 2009 and be finished and put into use by the end of that year. The construction period is 1 year.
Total invested amount is estimated to be 706000 thousand yuan which tended to be foreign capital entirely.
Binzhou Port, the port that is only at a distance of 130 kilometers from Tianjin Binhai Newly Develped Area, is the nearest port that connects Tianjin Binhai Newly Develpoed Area in Shandong. It is the sole access to the sea in Jinan Metropolis Circle. Binzhou Port is of decisive influence in promoting the exploitation of the High Efficient Ecological Economic District on the Yellow River Delta, the North Wing in the whole ecomomic layout (One Body, Two Wings) in Shandong. After the construction work of the 2 berthes is finished, we will further perfect the harbour function, improve the market compatitive capacity, enlarge the business scope, and thus offer favourable service circumstances for the cargo transport. This project has favourable national economic benefits and the national internal rate of return surpasses the 8% social discount rate. Besides comparatively good profitability, the project also enjoys considerable risk-resistant capacity.
iii) Binzhou Port Channel Dredge Project
Main Content of the Project:3000 Tonnage Channel and its coordinated facilities.Dredge Q’ty:2.22 million CBM.
Total invested amount is 90110 thousand yuan, among which 55610 thousand will be put in the primary construction course, and 34500 thousand in the secondry course.
Source of the Invested Capital: Capital reserves 19470 thousand yuan will be from the revenue of Wudi county. Foreign capital is planned to be 70.64 million yuan.
The Project Feasibility Report has been approved and authorized by the document (SDCDR[2006]650) of Shandong Committee of Development and Reform, and “The Initial Plan of Binzhou Port Channel Dredge Project” has been approved by the document (SDDC[2006]248) of Shandong Department of Communications. Now the initial course of the project has been finished by and large, in which 18.36 million yuan have been invested.
Afetr the implement of the project, the bottleneck in the development of the river port area will be eliminated, berth usage rate be improved, cargo transfer cost be lowered, and the regional and national economy will be significantly improved. The economic internal rate of return will far exceeds the social discount rate, and the economic net present value will top zero. The project is reasonable and feasible.
V. Work Condition
The General Plan of Binzhou Port has been approved by the Binzhou municipal government. The Project Feasibility Report has been worked out. With piolt embankment having been advanced 11 kilometers from land to the sea, stone dyke been made higher and wider, coordinated works like water, power, road and communications have been carried out in an all round way.
VI. Preferential Construction Policies
The municipal government of Binzhou provides a series of preferential policies for the construction of the port. With regard to nonprofitable infrastructural facilities, Investors may remit sea area fees. Concerning key national or provincial port construction projects, investors may reduce or remit sea area fees according to the law. For construction land with close relationship to the construction of the port, land use rights shall be procured by means of allocation only. With regard to the land for business purpose, land use rights shall be procured by means of transference or rental. Land transference fund or rental fee shall be taken according to the minimum standard. Land transference fund may be paid by stages. Land transference fund or rental fee may be entirely returned for the construction of infrastructurial port facilities. If the wasteland have been transformed into farmland by the means of filling up the sea, investors may use the land for agricultural pupose free of charge and the operation period will be no less than 30 years. Concerning infrastructurial port facilities being constructed on the salty low beaches, land use rights shall be procured by means of free allocation. In accordance with the principle of“He who makes investment gets benefit”,new land being transformed to by pilot embankments from low beaches and intertidal regions will belong to the investors. Joint-venture port enterprises with a business period of more than 15 years may enjoy a preferencial treatment by means of a reduction of local taxes.
VII. Methods of Cooperation
i)Construction, investment, BT, BOT, etc.
ii)To become a shareholder of the company.
iii)Other Methods
Contact Person:Tian Maotang Binzou Harbor Authority Vice Director
An Baoquan Binzou Harbor Authority
Investment Invitation Office Director
Address:No.367 Huanghe 5th Road, Binzhou city, Shandong
Tel:0543-2226803 2226830(Fax)
E-mail:wdxfabq@163.com
Brief Introduction For the Project of the Railway from Zhanhua county to Binzhou Port
I. Brief Account of the Bureau
Binzhou Local Railway Bureau was established and authorized by the document ([2005]26) of Binzhou Establishment Committee of Government Bodies in Nov, 2005. It is a county level public institution straigntly under the authotity of the municipal government with its all funds allocated by local avenue. There are three sections in the bureau: General Office, Project Management Section and Business Management Section. The main function is to plan, construct, supervise and handle local railways in Binzhou.
II. Scale and Main Content of the Construction
The local railway from Binzhou city to Binzhou port (is call Bingang Line for short) locates within the city proper of Binzhou in north Shandong. It stretches northward from Xiaoying Station of the Jiaoji railway line to Binzhou port and acts as an important port dredging railway.
i) Main Technical Standard
Railway Grade: Local Railway Level I; Line Number: one; Slope Limit: 4‰;
Designed Driving Speed: 120km/h; Minimum Curve Radius: 1200m in general circumstances and 800m in hard situation; Trailer Gear: internal combustion engine, prearranged electrochemical condition; Engine Type: DF4C;
Haulage Capacity: 4000t;
Effective Length of the Arrival and Departure Track: 850m, arrange 1050m in advance; Block Type: semi-automatic block system.
ii) General Condition of the Main Projects
The Length of the main line is about 61.03km;
Extra Large Sized Bridge: one, 640m;
Large and Medium Sized Bridge (medium sized bridge with frame structure included) : eleven, total 2197m;
Cubic Meters of Earth on Roadbed: 2756 thousand cubic meters;
Cubic Meters of Bricklaying, tiling or plastering: 198 thousand cubic meters;
Permanent Land: 191.53 hectares.
iii) Construction Period
Planned construction period will be 29 monthes.
III. Work Progress in the Initial Period
The compile work of the Project Feasibility Report has been finished and the land evaluation work is in progress.
IV. Market Analysis
Afeter the construction work is finished, Bingang Line will connect Jiaoji Line through Zidong Line and thus link with other lines in China. Recently, it will connect with the planned Dezhou-Binzhou-Yantai railway line, become an important part of the national railway system, join Huanghua-Dajiawa railway line and turn to be an important hub of communication in north Shandong area. It also serves as a key channel for economic, political and cultural communications between Binzhou and other cities in and out of Shandong.
In the near future, after the accomplishment of the project, raw salt 3 million ton/year, relevant chemical products like bromine and potassium chloride 1.1 million ton/year will be transported ouside. Coal 4.6 million ton/year will be transported inside and the the transport capacity of Bingang Line will be as much as 9.54 million ton/year. As for the long-range plan, raw salt 5 million ton/year,relevant chemical products like bromine and potassium chloride 3.1 million ton/year will be transported ouside. Coal 7.6 million ton/year will be transported inside and the the transport capacity of Bingang Line will be as much as 19.6 million ton/year.
V. Estimated Investment Amount and Source of the Funds
For Bingang Line Zhanhua-Binzhou port,total estimated investment value will be 1131.13 million yuan (Economic Index: 18371.4 thousand yuan/kilometer), among which static investment 1044.33 million yuan, loan interest in the construction period 71.84 million yuan, locomotive buying fee 11.2 million yuan and reserve circulating funds 3.76 million yuan. All funds are planned to be raised by investment invitation.
VI. Profit Analysis
In accordance with investigation, the current transport capacity is 9.54 million ton/year with the transport charge 0.17yuan/ton.Kilometer. In case of 70 kilometers, the transport charge will be 114 million yuan/year, cost 5 million yuan/year, annual profit 109 million yuan and the investment payback period will be 9.2 years. So the project enjoys sound investment profit, considerably strong profitability and risk-resistant capacity.
VII. Methods of Cooperation
i)BOT:The construction and running period may be negotiated by the two parties.
ii)BT:The investor solely makes the construction work and the government buys the project by equal amount instalment payment within the agreed number of years.
iii)Joint Venture: The investor becomes a shareholder of the local limited company.
iv)Other Methods.
VIII. Contact Method
Contact With: Binzhou Local Railway Bureau
Address:Communication Mansion,Huanghe 5th Road,Binzhou city,Shandong
Tel:0543-2226612 Fax:0543-2226608
E-mail:bztlj@163.com
Contact Person:Zhou Haibin,Vice Director
Brief Introduction of Bohai Bridge Project
I. Company Overview
Shandong Lubei Enterprise Group Corporation, located in Beihai New Area, is a large state-owned enterprise mainly focusing on ecological science and technology and recycling economy. Now, it owns 5,300 staffs and a total asset of RMB 11 billion Yuan and operates in 12 industries including chemical, building materials, light industry and power industry etc. It was granted with the title of “One of the First Batch of National Environment-friendly Enterprises” and “One of the First Batch of Nation-level Ecological Industrial Model Park Areas”by the State Environment Protection Administration, and it was approved as “One of the First Batch of Pilot Units of Recycling Economy” by six ministries and commissions such as the State Development and Reform Commission.
II. Construction Size and Major Contents of the Project
The main part of Bohai Bridge adopts extradosed cable-stayed design. Its major technical parameters are listed as follows: road grade: 1; main bridge includes bidirectional four lanes and two-side pathways; bridge width:23m; length of main bridge:360m; total length of bridge:1600m; subgrade: 20m; highest navigable water level: 3.07m; net width and net height of navigable single-span single channel: 120m and 23m; design flood frequency: 1/100; minimal radius of crest vertical curve: 2,000m; minimal radius of concave vertical curve: 1500m.
III. Construction Conditions
The project site has been well facilitated with all construction conditions including transportation, water, electricity and telecommunications etc.
IV. The Progress of Pre-project Works
The feasibility study report has been completed.
V. Market Survey and Analysis
Bohai Bridge links Beihai New Area and Tianjin Binhai New Area. After the bridge is completed, it can ensure convenient links between Shandong and Hebei, reduce empty return rate of train in Huanghua Harbor Railway, burden the transportation task of partial cargoes in Shandong Province and speed up the exploitation of resources and expedite the opening-up of the northern region of Shandong Province.
VI. Investment Budget Estimate and Capital Raising
The estimated total investment in the project is RMB 340 million Yuan. Self-raised funds are RMB 150 million Yuan and RMB 190 million Yuan foreign capital will be expected.
VII. Benefit Analysis
After the project is completed, it is estimated that internal rate of return will reach 9.38% and benefit-cost ratio is 1.6. The investment payback period of the project is 12.7 years and total capital enjoys a high risk-resistant capability. The project will play a very crucial role in promoting cooperation among economic regions around the Bohai Sea, realizing mutual complement and mutual benefit between Shandong and Hebei and ensuring harmonious development. Moreover, it can also bring obvious economic and social benefits.
VIII. Cooperation Form
Sino-foreign equity joint venture or sino-foreign cooperative joint venture
Legal Representative:Yisheng Feng Contact:Huatong Jiang Tel:0086-543-6451804
Address:Lubei High-tech Development Zone,Wudi County,Shandong Province
Postal Code:251909
Brief Introduction of Binzhou Harbor Water Supply Project
I. Company Overview
Shandong Lubei Enterprise Group Corporation, located in Beihai New Area, is a large state-owned enterprise mainly focusing on ecological science and technology and recycling economy. Now, it owns 5,300 staffs and a total asset of RMB 11 billion Yuan and operates in 12 industries including chemical, building materials, light industry and power industry etc. It was granted with the title of “One of the First Batch of National Environment-friendly Enterprises” and “One of the First Batch of Nation-level Ecological Industrial Model Park Areas”by the State Environment Protection Administration, and it was approved as “One of the First Batch of Pilot Units of Recycling Economy” by six ministries and commissions such as the State Development and Reform Commission.
II. Construction Size of Major Contents of the Project
The first period project of Binzhou Harbor water supply project will be designed with an annual water supply capacity of 46 million cubic meters. In the long term, it will be designed to station, water supply pipeline, water release gate of reservoir, check gate of seepage intercepting ditch and access bridge of seepage intercepting ditch.
III. Construction Conditions
The project site has been well facilitated with all construction conditions including transportation, water, electricity and telecommunications etc.
IV. The Progress of Pre-project Works
The feasibility study report has been completed.
V. Market Survey and Analysis
Binzhou Harbor water supply project is a people-benefiting project which helps to tackle the problem of short water supply of harbor region of Cangzhou. The project aims to provide water for industrial and domestic use to the Beihai New Area, Cangzhou Bohai New Area and Huanghua Port and supply water for agricultural irrigation use to Haixing County.
VI. Investment Budget Estimate and Capital Raising
The estimated total investment in the proiect is RMB 380 million Yuan. Self-raised funds are RMB 110 million Yuan and RMB 270 million Yuan foreign capital will be expected.
VII. Benefit Analysis
The project aims to annually provide the Yellow River water for Beihai New Area, Bohai New Area in Cangzhou of Hebei, so it helps to tackle conflicts between supply and demand for water resources. Besides, the project will play a very crucial role in promoting cooperation among economic regions around the Bohai Sea, realizing mutual complement and mutual benefit between Shandong and Hebei and ensuring harmonious development. Moreover, it can also bring obvious economic and social benefits.
VIII. Cooperation Form
Sino-foreign equity joint venture or sino-foreign cooperative joint venture
Legal Representative:Yisheng Feng Contact:Huatong Jiang Tel:0086-543-6451804
Address:Lubei High-tech Development Zone,Wudi County,Shandong Province
Postal Code:251909
Brief Introduction of Shejia Harbor Project of Binzhou Shejia Harbor Logistics Co., Ltd.
I. Company Overview
Binzhou Shejia Harbor Logistics Co., Ltd. owns fixed assets valuing RMB 9.5 million Yuan and 36 staffs and mainly operates in transportation of sand and stone etc.
II. Construction Size of Major Contents of the Project
The project contents include construction of one quay with 1000-tonnage berths, establishment of warehouses and procurement of load and unloading facilities at quay.
III. Construction Conditions
The project site has been well facilitated with all construction conditions including transportation, water, electricity and telecommunications etc.
IV. The Progress of Pre-project Works
The project proposal&confirmation procedure of Shejia Harbor quays with 200-tonnage berths has been completed and project permitting procedure of Shejia Harbor quays with 1000-tonnage berths (expansion project) is being handled.
V. Market Survey and Analysis
The project is located in the Beihai Sea New Area and is also a very important port to extend Wudi far into hinterland, so it enjoys great advantages in superior geographical location. There is a large import and export, so abundant cargo capacity can be ensured. Besides, Shejiagang Town owns 10,000 Mu of state-owned land resources which are still not occupied, so it enjoys broad prospects for development and construction. After the quay is completed, the cargo from Shejia Harbor can be transported to Binzhou Western Harbor and then direct delivered to some major ports such as Huanghua Port, Tianjin Port, Qingdao Port, Dalian Port, Shanghai Port and Longkou Port etc.
VI. Investment Budget Estimate and Capital Raising
The estimated total investment in this proiect is RMB 80 million Yuan. RMB 60 million Yuan will be invested in building one quay with 1000-tonnage berths, RMB 10 million Yuan will be used to build warehouse of 2,200 square meters in the south of quay and RMB 10 million Yuan will be used to procure 8 loading and unloading facilities such as gantry crane and crane etc. Self-raised funds are RMB 30 million Yuan and RMB 50 million Yuan foreign capital will be expected.
VII. Benefit Analysis
After Shejia Harbor project is completed, it is used to transport building materials essential for construction industry such as sand and stone mainly with the help of Binzhou Western Harbor. The estimated tax and profit revenues from the project will reach RMB 25 million Yuan, and it can provide many job opportunities for more than 100 surplus labors and helps to drive service industry growth.
VIII. Cooperation Form
Sino-foreign equity joint venture or sino-foreign cooperative joint venture
Legal Representative:Yuehua Wang Contact:Ruilong Li Tel:0086-543-6271111
Address:Shejiaxiang Town Government,Wudi County Postal Code:251903
Three 3000t Berths Project of Zhanhua East Port of Binzhou Port Co. Limited
Ⅰ. General situation
Zhanhua East Port of Binzhou Port Co. Limited was established in April 2005. The registered capital is 120 million RMB, and the main business is channel dredging, commercial port building, fishing port building, shipbuilding and salt industry. The company has 2 ports, which are Fuguo port and Dabao port, inland waterway of 43km and 35,000 mou mudflat and coast waters that ready to be developed.
Ⅱ. Project content and construction scale
To extend 3 3000t berths in the Dabao Binzhou port work region, in which 1 general berth and 2 special salt berths. And the port infrastructure construction will be carried out on the general berth.
Ⅲ. Construction condition
The project is located on the north part of Beihai new development area, and the construction of infrastructure is finished.
Ⅳ. Preparations for the project
The feasibility study report is finished.
Ⅴ. Market analysis
In recent years, many large and medium-sized enterprises settle in Zhanhua, there is goods of about 20,000,000t need transport by sea. In order to realize the water-land transshipment, Zhanhua has built a road by Tuhai River. With the development of Zhanhua, the project is imperative.
Ⅵ. Investment budget
Total investment:79,000,000RMB
Ⅶ. Benefit analysis
The benefit of national economy is good. In the fifth year, the cumulative total benefit is positive, the internal rate of return is 23.17%.
Ⅷ. Cooperation type
Sole proprietorship, joint stock cooperation, joint venture, land substitution
Zhanhua East Port of Binzhou Port Co. Limited
Mr.Yang Fudong
Tel:0543-7323137 Mobile:(0)13805432302
Fax:0543-7322275
Brief Introduction of 30MW Wind Farm Development Project of Shandong Chengkou Salt Chemical Limited Liability Company
I. Company Overview
Established in 1958, the company is located in Beihai New Area and was changed into a privately-owned enterprise in August 2004. Among enterprises across the county, it has first passed ISO9001 International Quality Management System Certification, ISO14000 Environmental Management System Certification and Occupational Health and Safety Management System (OHSAS) certification. And the company was awarded the title of ‘AA-level Unit’ by Shandong Branch of the Agricultural Bank of China. By the end of 2007, its total assets reached RMB 365 million Yuan, registered capital arrived at RMB 153 million Yuan, annual sales revenues were RMB 160 million Yuan and tax and profit revenues reached RMB 40 million Yuan.
II. Construction Size of Major Contents of the Project
According the long-run plan of the project, wind power installed capacity of 75MW should be completed. The first period project should be designed with a total installed capacity of 30MW. Initially, twenty 1,500KW wind-generator sets will be installed and at the same time twenty 35KV cabinet-type transformer stations will be built as supporting facilities.
III. Construction Conditions
The project site has been well facilitated with all construction conditions including transportation, water, electricity and telecommunications etc.
IV. The Progress of Pre-project Works
The feasibility study report on the project has been completed and reported to the Development and Reform Commission of Shandong Province for approval.
V. Market Survey and Analysis
Wind power is renewable and development of wind power generation conforms to the State’s industrial policy. In 2003, the State Development and Reform Commission put forward the following development plan and goal for wind power in China: China’s wind power installed capacity will reach 4 million KW in 2015 and this capacity will reach 10 million KW and 20 million KW in 2015 and 2020 respectively. This means that annual wind power installed capacity should reach 600 thousand KW in the upcoming 7 years and total wind power installed capacity during the period of 2010-2015 should reach 2 million KW. Thus there is a wide development space for wind power.
VI. Investment Budget Estimate and Capital Raising
The estimated total investment in this proiect is RMB 328 million Yuan. Self-raised funds by Shandong Chengkou Salt Chemical Limited Liability are RMB 98.45 million Yuan and RMB 230 million Yuan foreign capital will be expected.
VII. Benefit Analysis
According to 2006 actual measurement data of wind speed at 70 meters(4-20m/s), calculated annual effective wind speed time of the wind farm is 7,037 hours and wind speed frequency is 80%. The production operation period of project is 20 years, its financial internal rate of return is 15.2% and tax revenues will reach RMB 9.04 million Yuan. The project can bring obvious economic and social benefits, so it is feasible.
VIII. Cooperation Form
Sino-foreign equity joint venture or sino-foreign cooperative joint venture
Legal Representative:Rongqiang Zhang Contact:Fengsheng Ma Tel:0086-13505333326
Address:Gaotian Village,Mashanzi Town,Wudi County Postal Code:251907
Brief introduction of the project of comprehensive straw recovery for thermo-electrical power generation of Boxing CLP (Shandong) Biological Thermo-electrical Power Co., Ltd
Ⅰ. About the project
Boxing CLP (Shandong) Bi, ological Thermo-electrical Power Co., Ltd is a joint venture of CLP (Shandong) Biological Energy Co., Ltd, an exclusive subsidiary of CLP group (Hong Kong), and Boxing Huanyu Paper-Making Co., Ltd, which has a registered capital of RMB 88 million Yuan, among with the former invests in RMB 69.50 million Yuan and accounts for 79% of the equity, and the latter invests in the rest of 21% aorthy of RMB 18.50 million Yuan.
Ⅱ. Construction size and inclusions
The project possesses an area of 44,820 square meters, and which is a project of comprehensive straw recovery for thermo-electrical power generation with planned size of 3×75t/h+1×B6MW+1×C12MW. The 1st construction includes 1×75t/h+1×B6MW,the selected model of whole set is 1×75t/h high-temperature hypo-high-pressure direct-fired boiler and 1×B6MW-4.9/0.785 back pressure turbine.The 2nd construction includes 2×75t/h high-temperature hypo-high-pressure direct-fired boiler and 1×12MWsteam turbine generator set as well as subsidiaries of connecting system, fuel collection and storage system and etc.
Ⅲ. Conditions for construction
The straw resources is abundant in areas surrounding the power plant, in addition, convenient transportation, sufficient water supply and power connecting system are ready for use, hence good condition for construction is available.
Ⅳ. Progress of preliminary construction
The 1st construction has being approved by Shandong Development & Reform Commission and was commenced in construction in July 2007,the equipments installation is underway, and the project is scheduled to putting into production by May 2008. the report on environmental effect for the 2nd construction was approved by Shandong Environmental Protection Bureau, and the report on application of project construction is under examination for approval.
Ⅴ. Market analysis
Should the project is put into commercial operation, an anticipated annual output of electricity generation is up to 117,000MWh, with yearly supply of industrial steam of 936,400 GJ,therefore, the market demand is tremendous.
Ⅵ. Estimation and sources of financing
The 2nd construction is estimated with investment of RMB 120 million Yuan, and the portfolio is planned thru merchant invitation.
Ⅶ. , Prospective benefits
The project has a prospective annual turnover of RMB 99.24 million Yuan and income tax of RMB 24.98 million Yuan; yearly consumption of cotton straw is 200,000 tons, in other words, the farmers income is increased for more than RMB 40 million Yuan, and 100,000 tons of coal of once energy are saved; in conclusion, the project is characterized by comprehensive utilization and saving of energy, improved quality of heat supply, more general benefits of power supply, thus it’s a public constructive project in terms of prevention and solution for air pollution and improvement of energy recovery, by doing which the waste local resources are properly recovered to meet the energy demand for business development in addition to increase of farmers income and relief of environmental pollution, and the social benefits and economic well-being are achieved.
Ⅷ. Mode of cooperation,
Joint venture, cooperation
Contact person:Lv Jiqing &, nbsp; Call:15305436000 0543-2169299
Fax:0543-2169277 Email:aaronlui@126.com
Brief introduction of the project of comprehensive straw recovery for thermo-electrical power generation of Boxing CLP (Shandong) Biological Thermo-electrical Power Co., Ltd
Ⅰ. About the project
Boxing CLP (Shandong) Biological Thermo-electrical Power Co., Ltd is a joint venture of CLP (Shandong) Biological Energy Co., Ltd, an exclusive subsidiary of CLP group (Hong Kong), and Boxing Huanyu Paper-Making Co., Ltd, which has a registered capital of RMB 88 million Yuan, among with the former invests in RMB 69.50 million Yuan and accounts for 79% of the equity, and the latter invests in the rest of 21% aorthy of RMB 18.50 million Yuan.
Ⅱ. Construction size and inclusions
The project possesses an area of 44,820 square meters, and which is a project of comprehensive straw recovery for thermo-electrical power generation with planned size of 3×75t/h+1×B6MW+1×C12MW. The 1st construction includes 1×75t/h+1×B6MW,the selected model of whole set is 1×75t/h high-temperature hypo-high-pressure direct-fired boiler and 1×B6MW-4.9/0.785 back pressure turbine.The 2nd construction includes 2×75t/h high-temperature hypo-high-pressure direct-fired boiler and 1×12MWsteam turbine generator set as well as subsidiaries of connecting system, fuel collection and storage system and etc.
Ⅲ. Conditions for construction
The straw resources is abundant in areas surrounding the power plant, in addition, convenient transportation, sufficient water supply and power connecting system are ready for use, hence good condition for construction is available.
Ⅳ. Progress of preliminary construction
The 1st construction has being approved by Shandong Development & Reform Commission and was commenced in construction in July 2007,the equipments installation is underway, and the project is scheduled to putting into production by May 2008. the report on environmental effect for the 2nd construction was approved by Shandong Environmental Protection Bureau, and the report on application of project construction is under examination for approval.
Ⅴ. Market analysis
Should the project is put into commercial operation, an anticipated annual output of electricity generation is up to 117,000MWh, with yearly supply of industrial steam of 936,400 GJ,therefore, the market demand is tremendous.
Ⅵ. Estimation and sources of financing
The 2nd construction is estimated with investment of RMB 120 million Yuan, and the portfolio is planned thru merchant invitation.
Ⅶ. Prospective benefits
The project has a prospective annual turnover of RMB 99.24 million Yuan and income tax of RMB 24.98 million Yuan; yearly consumption of cotton straw is 200,000 tons, in other words, the farmers income is increased for more than RMB 40 million Yuan, and 100,000 tons of coal of once energy are saved; in conclusion, the project is characterized by comprehensive utilization and saving of energy, improved quality of heat supply, more general benefits of power supply, thus it’s a public constructive project in terms of prevention and solution for air pollution and improvement of energy recovery, by doing which the waste local resources are properly recovered to meet the energy demand for business development in addition to increase of farmers income and relief of environmental pollution, and the social benefits and economic well-being are achieved.
Ⅷ. Mode of cooperation
Joint venture, cooperation
Contact person:Lv Jiqing Call:15305436000 0543-2169299
Fax:0543-2169277 Email:aaronlui@126.com
Project of Boxing reservoir
Ⅰ. About the employer
The Boxing Water Affairs Bureau is the authority of Boxing People’s Government in charge of water affirs of the county, including united management of water resources, construction and control of farmland irrigation engineering, prevention and fighting of drought and flood, water use supervision, preservation of water and soil, water supply and etc. the bureau has380 staffs, among whom 13 are senior engineers, 58 are of medium technical titles and 160 of holders of primary technical post of various specialties. A total of 9 party branches are established by the CPC Committee of the bureau, with 210 party members. The unit is awarded as in succession as demonstration unit for irrigation technology in Shandong province, provincial model unit for irrigation discipline supervision, provincial model unit of irrigation system and etc.
Ⅱ. Construction size and inclusions
According to forecast on supply and demand of water resources within the project area, the design cubage of the reservoir is 20 million cubic meters. The construction works include mainly of seven sections, namely, embankment, pump station, seepage intercepting ditch, water purification plant, water channel, entrance water gate for introduction of river water and that of the Yellow River and other subsidiary buildings.
Ⅲ. Conditions for construction
Construction of transportation facility, power supply, telecommunication and etc is completed.
Ⅳ. Preparation
The preliminary construction of the project is commenced, and the report on feasibility research is under preparation.
Ⅴ. Market analysis
The Boxing Reservoir is a plain type reservoir that is planned and constructed in adapting to the increasingly urgent situation of water supply and demand for the town area and the Nanjing irrigation area of Xiaoqinghe River. For years, the water use of the two areas are relied upon exploitation of ground water; along with rapid economic boom, the water use for various industries is increased to a high, and the construction of the project can help lessening the burden.
Ⅵ. Estimation and sources of financing
The portfolio needed for the project is RMB 190 million Yuan, andRMB135 million Yuan is planned to finance thru merchant invitation.
Ⅶ. Market prospect
Upon completion of the project, the burden of supply and demand of water resources for the town area and the Nanjing irrigation area of Xiaoqinghe River will be lessened, and which is a guarantee for sustainable development of local economy.
Ⅷ. Option of business
Joint venture or cooperation is available.
Contact person:Wang Xiujiang Call:0543-2321097 2321095(Fax)
Address:345 of the 5th Bocheng Road,Boxing County,Shandong;
Project of the Second Xingfu Reservoir By Yangxin water supply Company
Ⅰ. Brief induction of enterprise
Yangxin water supply Company is a state-owned public utility company with credit grade 4. It has total assets of RMB 36.6 million with fixed assets of RMB 34.42 million, current funds RMB 2.49 million, and the property liabilities rate is 47.24%.The employees is 98.
Ⅱ. Construction content and scale
The reservoir's design contain is 10,710,000 cube meters, annual water storage 22,280,000 cube meters, surrounding dam length 6,370 meter, soil 690,900 cube meters, separating dam length 1,050 meter, soil 105,500 cube meters, seepage interception ditch 6673 meter, soil 9,340 cube meters.
Ⅲ. Construction condition
The infrastructure facilities like transportation, water, electricity, gas and telecommunications are well-found. The construction has been started on the expansion project of water factory and pipe networks.
Ⅳ. Progress of project
The project has been under construction, approved by Development and Reform Commission of Shandong Province.
Ⅴ. Analysis of market
In recent years, along with the economy development and city population continuously increasing, only depending on mining groundwater has not already satisfy the development demand, it is necessarily to use the yellow river water, and the amount is huge. So far, the annual life water consume is 8,395,000 cube meters. Based on 1.8 Yuan per cube meters, the annual sales income is RMB 15.11 million.
Ⅵ. Investment budget and fund resource
Total investment is RMB 70.2 million with the amount of RMB 34.4 million be introduced, another RMB 35.8 million will be invested by the workshop, land and cash etc..
Ⅶ. Analysis of project profit
The construction period is 2 years. After operation, the annual sales income can realize RMB 20.8 million. The return on investment is 29.6%, and the investment payoff period is 3.4 years
Ⅷ. Cooperation ways
Joint venture or cooperative
Person to contact:Cui Yufang General Manager
Address:No.243,Yangcheng 3rd Road,Yangxin County,Shandong Province,China
Post code:251800
Tel:86-543-8212674 Fax:86-543-8221333
Introduction of the project of Boxing solid waste general treatment plant
Ⅰ. About the employer
The Boxing Environment and Sanitation Office is an affiliate of Boxing People’s Government and with total assets of RMB 5.563 million Yuan and 216 staffs. the Boxing Municipal Management Office is in charge of construction of municipal engineering, environment and sanitation, garden greening, street lamp, municipal establishment, municipal appearance and aesthetics. So far, the standardization and equipment of machinery for better municipal appearance is promoted step by step in terms of tens of sets of waste conveyer, waste loader and other loading equipments, and the unit is the only one capable for general treatment and control of municipal solid waste in Boxing.
Ⅱ. Construction size and inclusions
According to analysis and estimation of waste output and components classification and in consideration of the status quo and development trend of within the project area, the method of burning and land-filling of solid waste with daily capacity of 300 tons of various living wastes will be employed for the project. And municipal solid waste will be the most part of land-filling, including living waste of residents, commercial garbage, trash of terminal market, street litter, public waste, solid waste of institutions, schools, plants and mines and etc.
Ⅲ. Conditions for construction
So far, the standardization and equipment of machinery for better municipal appearance is promoted step by step in terms of tens of sets of waste conveyer, waste loader and other loading equipments. And construction of infrastructures including transportation facility, power supply, telecommunication and etc are completed.
Ⅳ. Preparation
The project is approved of land expropriation and environment appraisal, and other related procedures are underway.
Ⅴ. Market analysis
Along with rapid social and economic development in Boxing County, the output of solid waste produced in town and industrial zone is increased accordingly year by year. Hence it’s indispensable for construction of municipal waster treatment plant, by which not only the digestion and accommodation of municipal solid waste is radically settled, sustainable social and economic development is promoted in terms of nuisance to avail and waste to worth, but also creation of an ideal environment for living and working; therefore, it’s significant for sustainable development of municipal ecosystem and promising for future progress.
Ⅵ. Estimation and sources of financing
The project is budgeted with portfolio of RMB 42.97 million Yuan, and RMB 30 million is planned to finance thru merchant invitation.
Ⅶ. Analysis on return
The project has an anticipated profit margin of 4.92%, financial internal rate of return of 6.78%; net present value of(ic=6%)RMB 2.58 million Yuan and return period of 11.53 years(1 year of construction is included). The construction can promote harmless, reduction and recycling of solid waste as well as better environment and sanitation, improve the investment atmosphere, speed up the urbanization course, basically settle the problem of treatment of waste produced in the town area, helpful for improved environmental quality, contribute to health of aboriginals, benefit the after-generations and ultimately push forward development of various social aspects.
Ⅷ. Option of business
Joint venture or cooperation;
Contact person:Wu Shuyu Call:0543-2306230
Fax:2303675 Email:bxwsy@sina.com
Address:99 of the 2nd Bocheng Road,Boxing County,Shandong
Introduction of the project of Boxing Waste Water Disposal Plant
I. About the employer
The Boxing Construction Bureau is the authority of boxing county in charge of construction, mainly including administration of town construction, town planning, development of housing, surveying and designing of construction project, quality control, supervision and etc, so far,there’re 74 official staffs at this department.
II. Construction size and inclusions
This project includes mainly of construction of production management zone (plant front zone, facilities for the 1st and the 2nd constructions), waste water disposal zone and sludge treatment zone. The 1st construction with disposal capacity of waste water of 30,000-ton/day is completed, and which is planned to reconstruct prior to commencement of the 2nd construction so as to increase the capacity to 60,000-ton/day. During the 2nd construction, the return flow from the previous biological filter will be altered as the water supply of the compound hydrolyzing pool so as to fulfill nitrogen removal thru the fundamental of nitration and de-nitrification as well as dephosphorization by reaction of organism and chemical agents so that the whole workmanship is effective in terms of nitrogen removal and dephosphorization and that the final water emission is conformity to late national standard.
III. Advantages for construction
The project is scheduled for the 2nd construction of the waste water disposal plant in light of the real field, building surface elevation, landform, earthwork balance, construction layout and etc, and the plant area is ideally even in landform.
IV. Progress of preparation
The 1st construction is approved by Shandong Development & Reform Committee (Circular of Nujitouzi [2002] 7), and the draft budget for expansion of the waste water disposal plant is approved by Shandong Development & Reform Committee (Circular of Nujizhongdian [2004] 813).
V. Market demand
Currently, the waste water produced in the whole Boxing town area is unable to disposed totally, and the emission of waste water in the future is more than present along with rapid economic development; in order to maintain local environmental quality and enjoy sustainable economic development, it’s urgently necessary for reconstruction of the 1st construction and the 2nd construction of Boxing Waste Water Disposal Plant.
VI. Estimation and sources of financing
The project is estimated with investment of RMB 70 million Yuan, and the portfolio is planned thru merchant invitation.
VII. Prospective benefits
Upon putting into commercial operation, the project will have a disposal capacity of waste water of 60,000-ton/day, which is remarkably beneficial to local environment and economy as well as significant for improvement of water quality of rivers, town environment, investment incentive, momentum for general planning of town area and guarantee for sustainable development of society and economy.
VIII. Option of business
Development and construction exclusively by capable overseas enterprise;
Contact person:Zhao XiaoBo
Call:0543-2321271 E-mail:czk197@163.com
Brief Introduction of Beihai New Area Sewage Treatment Plant Project
I. Unit Overview
Binzhou Western Harbor Management Committee in Beihai New Area owns a fixed asset of RMB 20 million Yuan and 60 staffs. Its annual sales revenues reach RMB 15 million Yuan, annual tax and profit revenues arrive at RMB 2 million Yuan and asset-debt ratio is 17%.
II. Construction Size and Contents of the Project
The project aims to set up two sewage treatment plants. The northern sewage treatment plant is located in the southwest of Binzhou Western Harbor and will has a sewage treatment capacity of 25 thousand tons per day and 90 thousand tons in 2010 and 2025 respectively. The southern sewage treatment plant is located in the startup zone of Beihai New Area and will has a sewage treatment capacity of 20 thousand tons per day and 70 thousand tons per day in 2010 and 2025 respectively.
III. Construction Conditions
The project site has been well facilitated with all construction conditions including transportation, water, electricity, gas and telecommunications etc. Besides, Wudi County government relevant departments have formulated policies on sewage treatment rate for project zone.
IV. The Progress of Pre-project Works
The feasibility study report and planning have been completed.
V. Market Analysis
With fast development of economy and population growth (the population of the zone will hit 250 thousand in the long run.), sewage problems will have a direct impact on people’s work and life and local investment environment. The main sewage treatment facilities available in planned zone are oil-bearing sewage treatment stations and treatment capacity of these facilities falls short of requirements of economic development of certain regions. 30 square kilometers of chemical industrial park has been planned in Beihai New Area, so it is very imperative to tackle sewage discharge problems. The implementation of this project will help to gradually tackle aewage problems during the course of the development of Beihai New Area and direct improve the water quality of water systems. Meanwhile, the project will play a very crucial role in the improvement of overall quality of urban environment and urban sustainable economic development.
VI. Investment Budget Estimate and Capital Raising
The estimated total investment in this project is RMB 200 million Yuan. Self-raised funds are RMB 50 million Yuan and RMB 150 million Yuan foreign capital will be expected.
VII. Benefit Analysis
The completed first-period project has a sewage treatment capacity of 60 thousand tons per day and the completed second-period project has a sewage treatment capacity of 160 thousand tons per day, and its annual sales revenues will reach RMB 30 million Yuan, so it can bring good economic, social and environmental benefits.
VIII. Cooperation Form
Sole foreign proprietorship, sino-foreign equity joint venture or sino-foreign cooperative joint venture
Contact:Yanbo Qiu Tel(Fax):0086-543-6573116
E-mail:binzhou_port@163.com
Address:Management Committee of Western Harbor of Binzhou Harbor
Introduction to the Project of Zouping Weiqiao Sewage Treatment Factory
I. Enterprise Profile
Zouping Weiqiao Sewage Treatment Factory was authorized by Zouping county government and built by Shandong Tiandiyuan Paper Industry Co., Ltd. The registered capital of Shandong Tiandiyuan Paper Industry Co., Ltd. is 100 million yuan. At present, its assets is 494.21 million yuan and the annual productivity of it is 20 thousand tons of household paper and 200 thousand tons of high strength corrugated paper. In 2007, its sales income was 611.65 million yuan, the profit was 99.51 million yuan and the tax was 41.89 million yuan.
II. Construction Scale and the Main Construction Contents
Zouping Weiqiao Sewage Treatment Factory is a municipal-and county-wide key construction project. The daily sewage treatment capacity will be 60,000 m, the improved A2/0 technology will be used and the pipe network will be 45 km. In addition, the daily reuse water treatment capacity of the factory is 20,000 m3 and the V shaped filter disinfecting technology will be used. The treated reused water will be supplied to paper manufacturing enterprises and municipal works and gardens. The consturction contents include wide and thin grid room, elevated pump house, primary sedimentation, A2/0 tank, second setting tank, air-blower, dewatering room, sewage pipes, V shaped filter and so on.
III. Progress of the Prophase Work of the Project
At present, environmental protection evaluation and approval, feasibility report and approval and primary design and approval of the project have been completed and the design of construction drawing is almost finished. The project is planned to be built in the May of 2008 and in the December of 2009, it will be put into use.
IV. Market Analysis
With the rapid development of the economy of Weiqiao, a famous town all around China, the tasks of saving energy and reducing sewage are also more and more heavy. The construction of Weiqiao Sewage Treatment Factory will have the function of protecting environment and complete the task of saving water and reducing sewage. Moreover, there will also be some economic benefit.
V. Progress of the Prophase Work of the Project
The overall investment of the project is 85 million yuan, in which 60 million yuan will be foreign fund and the local fund will be 25 million yuan.
VI. Benefit Analysis
After the project is put into use, the sewage of the city can be effectively controlled and the water quality of Weiqiao section of Xiaoqing River can be improved, furthermore, the living environment of the residents will also be enhanced. In addition, this project will play an important role in the“South-to-North Water Diversion Project”and“West-to-East Water Diversion Project”.
VII. Cooperation Mode
Cooperation shall be carried out in the BT method.
Contact person:Zhang Hongwei Tel:0543-4224997 4224999(Fax)
Address:172#,Yuehe First Road,Zouping County E-mail:qu_yan002007@126.com
Sewage treatment plant project of Shandong Zhanhua Economic Development Zone
I. General introduction of Shandong Zhanhua Economic Development Zone
Shandong Zhanhua Economic Development Zon, e, the total area is 12 km2, has been approved to be provincial level economic development zone by Shandong Government in Mar., 2006.
After the development of several years, there have been 99 firms settled in Zhanhua Economic Development Zone. There are 10 firms of investment of 100 million RMB, 6 firms of investment of 50 million RMB, 83 firms of investment of 10 million RMB; and 45 firms have been operated, 44 firms are being established. The 4 main industrial systems are electric power, oil-salt industry, food and medicine, new material.
II. Construction scale and content
Construct the project for 2 stages. The first stage is to construct the workshop building and other facilities for 15,000t/d; the second stage is to construct the facilities for 15,000t/d. The scale will be 30,000t/d in 4 years.
III. Construction condition
The south of the economic development zone is Yongguan road; and there are 1km from development zone to Weiwu highway, 3km to Fuguo port and 4km to Fuguo railway station, 2 hours’driving to Jinan Airport. So the traffic condition is convenient. The water, electricity, gas and communication are also ready. The county government has already established the policy concerning sewage fee.
IV. Preparations for the project
The feasibility study report is finished.
V. Market analysis
With the development of Zhanhua Economic Development Zone, a plenty of industry wastewater of the plants is producing. In order to protect the environment of Zhanhua, the construction of the project is necessary.
VI. Investment budget
Total investment: 50 million RMB; the first stage is 30 million RMB, the second stage is 20 million RMB.
Sole Proprietorship or cooperation
VII. Benefit analysis
When the project finished, the benefit of the company is from the grant-in-aid and sewage treatment income. The project will benefit the environment and the society.
VIII. Cooperation type
BOT or cooperation
Shandong Zhanhua Economic Development Zone
Mr. Wang Zhenchun
Tel:0543-7311159 Fax:0543-7311159
Brief Introduction of Xinhai Sewage Treatment Plant Project of Wudi County
I. Unit Overview
The project is located in Beihai New Area and is undertaken by Xinhai Management Committee of Projects-gathering Zone of Wudi County. The office of Management Committee, established in October 2006, is located in Liupu Town of Wudi County. With mutual efforts of the Organization Department of Construction of Ecological Xinhai and the Management Committee of Xinhai Industrial Park, the number of enterprises which have settled in industrial zone is gradually increasing. The rapid construction of projects of enterprises will help to obviously enhance economic and social benefits and comprehensive strength and accordingly ensure further promotion in driving effect and core competitiveness.
II. Construction Size of Major Contents of the Project
The first-period project of sewage treatment plant which is under construction aims to provide a sewage treatment capacity of 30 thousand tons per day and the second-period project of the plant has a sewage treatment capacity of 20 thousand tons per day. After the whole project is completed, the plant will have a sewage treatment capacity of 50 thousand tons per day.
III. Construction Conditions
The project site has been well facilitated with all construction conditions including transportation, water, electricity, gas and telecommunications etc. Besides, Wudi County government departments have formulated concerned policies on sewage treatment rate for project zone.
IV. The Progress of the Pre-project Works
The pre-project works including environmental impact assessment and land use procedures have been completed and approval reply for project listing has been completed by the Development and Reform Commission of Shandong Province.
V. Market Survey and Analysis
Currently, the capacity of sewage in Beihai New Area reaches 10.9 thousand tons. Along with the fast development of Xinhai projects-gathering zone, especially the completion and subsequent production implementation of projects within industrial park, a lot of industrial sewage will be discharged. Although the treated sewage has conformed to Class III Sewage Discharge Standard, Class III of Environmental Quality Standards for Surface Water (GB3838-2002) was still implemented for some water systems such as Dehuixin River within industrial zone. Therefore, if the industrial sewage is not secondarily treated by sewage treatment plant in town, it will greatly influence the quality of the water of Dehuixin River. For this reason, Xinhai Management Committee of Projects-gathering Zone timely put forward a project plan for Xinhai Sewage Treatment Plant in order to develop “Reed-Project-Ecology-Benefit” sustainable ecological recycling economy.
VI. Investment Budget Estimate and Capital Raising
The estimated total investment in the project is RMB 49.12 million Yuan. Self-raised funds are RMB 19.12 million Yuan and RMB 30 million Yuan foreign capital will be expected.
VII. Benefit Analysis
The sewage rate is RMB 0.8 Yuan per ton and the charge for sewage treatment and reuse is RMB 1 Yuan per ton. After the whole project is completed and put into production, the annual revenues of this project will reach RMB 7.72 million Yuan, and financial internal rate of return (FIRR) will reach 5.53% and payback period (including construction period) is 12.67 years.
VIII. Cooperation Form
Sino-foreign equity joint venture or sino-foreign cooperative joint venture
Contact:Baoyi Yang Tel:0086-543-2155689
Address:Xinhai Project Gathering Zone,Wudi County,Shandong Province